Tiger Rig oil field equipment JC 40DB JC50DB JC70DB ...

22 Jul.,2024

 

Tiger Rig oil field equipment JC 40DB JC50DB JC70DB ...

Every payment you make on Alibaba.com is secured with strict SSL encryption and PCI DSS data protection protocols

Yingpai Product Page

Refund policy & Easy Return

Claim a refund if your order doesn't ship, is missing, or arrives with product issues, plus free local returns for defects

Project_Report[2] | PDF

Your Field is Getting Older: Is your Process Engineering Still Cost Effective?

Contact us to discuss your requirements of xj250 truck mounted workover rig. Our experienced sales team can help you identify the options that best suit your needs.

Society of Petroleum Engineers

 

The lifecycle of developed fields, onshore and offshore will go through different stages of production up to the decline into late field life. Effective reservoir engineering management will lead to prolonging the life of field if a cost effective processing surface facilities strategy is put in place. Factors that lead to the decline in oil production or increase in OPEX may include increased water production, solids handling and the need for relatively higher compression requirements for gas lift. In order to maintain productivity and profitability, an effective holistic engineering approach to optimizing the process surface facilities must be utilized. The challenges of Optimizing Mature Field Production are: 1. Reservoir understanding with potential definition of additional reserves 2. Complete re-appraisal of the operability issues in the production facilities 3. Develop confidence to invest to optimize the process handling capabilities and capacity 4. Low CAPEX simplification of the surface facilities infrastructure to meet challenges 5. An implementation plan that recognizes the &#;Brownfield&#; complexities 6. Selection of suitable optimum technology, configuration and training 7. Optimum upgrade plan of the facilities with minimum production losses Successful operation of mature fields and their surface facilities requires successful change management to the new operating strategy. Using a holistic approach can maximize the full potential of mature processing facilities at a manageable CAPEX and OPEX. Dr. Wally Georgie Dr. Wally Georgie has a B.Sc degree in Chemistry, M.Sc in Polymer Technology, M.Sc in Safety Engineering and PhD in Applied Chemistry with training courses in oil and gas process engineering, production, reservoir and corrosion engineering. He has worked for over 37 years in different areas of oil and gas production facilities, including corrosion control, flow assurance, fluid separation, separator design, gas handling and produced water. He started his career in oil and gas services sector in based in the UK and working globally with different production issues then joined Statoil as senior staff engineer and later as technical advisor in the Norwegian sector of the North Sea. Working as part of operation team on oil and gas production facilities key focus areas included optimization, operation trouble-shooting, de-bottlenecking, oil water separation, slug handling, process verification, and myriad other fluid and gas handling issues. He then started working in March as a consultant globally both offshore and onshore, conventional and unconventional in the area of separation trouble shooting, operation assurance, produced water management, gas handling problems, flow assurance, system integrities and production chemistry, with emphasis in dealing with mature facilities worldwide.

Want more information on m-m land oil drilling rig supplier? Feel free to contact us.