Top Gas Recovery Turbine Unit Retrofitting

29 Apr.,2024

 

Top Gas Recovery Turbine Unit Retrofitting

Product Introduction

For more china plane cutter high frequency quenching supplierinformation, please contact us. We will provide professional answers.

1250m3 Blast Furnace Top Gas Recovery Turbine (TRT)

Steam Path Optimization Technical Scheme


Table of Contents

1. Overview of TRT Unit

2. Current Operation Analysis of TRT Unit

3. Advanced Technology and Design Method for Optimization and Transformation of TRT Flow Passage

4. TRT Flow Passage Optimization Result

5. On-line Energy Efficiency and Life Analysis Management Intelligence System for Blast Furnace Gas Turbine

6. Optimization and transformation scope of TRT flow passage and compliance with standard

6.1.TRT Flow Transformation Follow Standard

6.2.TRT Flow Transformation and Scope of Supply

7. TRT Transformation Workflow and Cycle

8. measures to prolong leaf life and benefits

9. Quality Assurance and Performance Compliance Assurance

10. after-sales service

10.1.TRT Transformation Site Service

10.2. Long-term TRT Maintenance Service

10.3. Long-term supply of spare parts such as blades

11. Relevant Annex


1.TRT Unit Overview

* * * * * * * * * * * The 1250m3 blast furnace of the company (hereinafter referred to as "* * * * * * Steel") adopts dry bag dust removal, and its matching blast furnace gas turbine TRT uses the residual pressure of blast furnace top gas to generate electricity, bringing huge economic benefits to the enterprise.

The TRT unit was designed and manufactured by Xi 'an Shangu Power Co., Ltd. using Mitsui and Sulzer technologies introduced in its early years. The model number is MPG9.2-280.6/180.Compared with the most advanced TRT technology in developed countries, there is still a big gap in the performance index of domestic TRT units, which is reflected in the efficiency of flow passage. Domestic units are still in the range of 65%~75%, significantly lower than the international advanced level of 84~92%.Therefore, it is necessary to optimize the flow passage of TRT units in operation.

We absorbs the most advanced TRT turbine flow passage design technology from Germany and Japan and applies it to TRT units currently in service in China, which can greatly improve TRT efficiency, i.e. under the existing gas flow rate, pressure, temperature and composition parameters, the generating power of the unit will increase by 10%~20%, creating more economic benefits and contributing to energy conservation and emission reduction.


Table 1 TRT Original Design Parameters

Projects

Unit

Operating point



design point

Maximum point

Local atmospheric pressure

KPa(A)

100

Turbine speed

r/min

3000

Turbine inlet gas flow

10,000 Nm3/h

245000

270000

Turbine inlet gas pressure

KPa(G)

180

200

Turbine inlet gas temperature

180

230

Gas pressure at turbine outlet

KPa(G)

10

10

Turbine series

-

2

2

Turbine power

KW

7230

9200


2.Current Operation Analysis of TRT Unit

According to historical operation records, the analysis of the unit's operation on a certain day (as shown in fig. 1) shows that with the fluctuation of inlet flow, the actual operation efficiency value of the unit is between 60-75%.

Fig. 1 operation status of the TRT unit on a certain day (efficiency and inlet flow rate)


Fig. 2 operation status record of the TRT unit on a certain day



Analysis of the flow capacity at the operating point of this type of unit is as follows:


Fig. 3 mach number distribution of this type of unit before through-flow modification


Fig. 4 velocity distribution of this type of unit before through-flow modification

Through the analysis of three-dimensional CFD flow field, it can be seen that the aerodynamic design of static blades and moving blades of this type of unit is relatively backward, and there are many problems in the distribution of airflow: unreasonable velocity and angle distribution, separated flow and backward profile. As shown in fig. 4, the stagnation point of the second stage rotor blade deviates from the leading edge and is located at the front end of the pressure. There is obvious impact angle loss. The high speed region of suction surface increases the flow loss. There are obvious flow separation phenomena on the suction surfaces of the first and second stage rotor blades, resulting in vortex loss and unstable internal flow field. All these have resulted in low flow efficiency and the flow passage needs to be optimized.


3.Advanced Technology and Design Method for Optimization and Reconstruction of TRT Flow Passage


4.TRT Flow Passage Optimization Results

Flow optimization design follows the above-mentioned analysis and design process. Firstly, macro (one-dimensional, two-dimensional) and micro (three-dimensional CFD) calculation and evaluation are carried out on the current unit to analyze the aerodynamic problems of the current unit design. Then combined with the advanced reactive turbine aerodynamic design concept, the flow path arrangement (one-dimensional), vortex control flow pattern (two-dimensional), blade shape and stage matching are gradually deepened and optimized, and finally a reliable aerodynamic design scheme is formed.



Fig. 5 original meridian plane flow design

●Height and Angle Design of Meridian Channel;

-Optimization of axial velocity distribution; -The best blade aspect ratio; -Reducing gap loss;

●Blade spacing optimization:

-Reduce secondary flow loss and wake loss;

●Radial Vortex Control Redesign;

-Reduce the loss of secondary flow; -Reducing loss of attack angle; -Optimizing the exhaust angle;



Fig. 6 meridian plane flow design and blade arrangement after optimization of one-dimensional and two-dimensional design

Through one-dimensional and two-dimensional design, a more reasonable meridian plane flow passage design can be obtained, which makes the air flow distribution more uniform, and the enthalpy drop distribution at all levels and the setting of reaction degree tend to be reasonable.The blade aspect ratio, relative pitch and other key geometric parameters affecting aerodynamics are in the best interval. Combining advanced profile and vortex control technology, most of the problems in the original aerodynamic design can be overcome.

Using the optimization methods and methods described above, the following three-dimensional flow field results were obtained under the same inlet parameters

Fig. 7 mach number distribution after flow optimization for units of the same type

As can be seen from the above figure, the impact angle loss is obviously reduced after optimization, and the stagnation point position offset is corrected.There is no longer flow separation in the rotor blades, and the flow distribution in the second stage stator blades is also improved.Generally speaking, the optimized design makes the flow field distribution more uniform and reasonable in both axial and radial directions, reduces the fluid separation, secondary flow loss, impingement angle loss and exhaust loss, and greatly improves the overall efficiency.

The optimized two-stage blade is designed with pure reaction type, and the matching of load coefficient and reaction degree is close to the ideal value, which greatly reduces the residual velocity loss and improves the efficiency of exhaust diffuser.


Fig. 8 velocity distribution after flow optimization for units of the same type


Table 3 TRT Flow Optimization Results

Projects

Unit

Operating point

Local atmospheric pressure

KPa(A)

101.325

Turbine speed

r/min

3000

Turbine inlet gas flow

10,000 Nm3/h

24.5

Turbine inlet gas pressure

KPa(G)

180

Turbine inlet gas temperature

180

Gas pressure at turbine outlet

KPa(G)

10

Turbine series

-

2

Turbine flow efficiency

%

86.0

Turbine power

KW

8122


It can be seen from the above that after optimization, the internal efficiency of flow passage reaches 86.0%, with an increase of more than 10%. Under the same inlet conditions (flow rate, pressure, temperature, composition, etc.), the unit output increases 892kW; compared with the design value of 7230kW.According to the industrial average electricity price of 0.65 yuan per kilowatt-hour and the annual utilization of 8000h hours, the annual increase in power generation is 7.316 million kilowatt-hours and the power generation benefit is 4.638 million yuan.

The performance of the TRT unit under variable working conditions (partial load and peak load) is greatly improved, and the efficiency curve is relatively flat compared with the original in a wider variable load range, so that the TRT unit as a whole is in an optimal high-efficiency operation state.


The service life of TRT blades is prolonged, the interval of overhaul periods is prolonged, and the overhaul workload is reduced.

The problems of large blade vibration, high thrust tile temperature and the like of the unit are solved, and the safety and usability of the unit are improved.


5.Intelligent Management System for On-line Energy Efficiency and Life Analysis of Blast Furnace Turbine

This solution also includes a set of "intelligent system for on-line energy efficiency and life management of blast furnace gas turbine" (TELM+ system). this system can not only analyze the energy efficiency index of gas turbine on-line and in real time, but also generate a large amount of data for operation. through the intelligent algorithm of the system and its own expert system, operation optimization suggestions are given to enable the unit to operate in a higher efficiency point area.However, for the blade dust accumulation and blade erosion missing type, through the embedded intelligent prediction module, the degree of blade dust accumulation and blade missing type are given by artificial intelligence, providing scientific judgment basis for taking corresponding measures.

The system has the capability of machine learning. With the accumulation of operation data, the energy efficiency analysis and life prediction reports automatically generated by the system become more accurate, which greatly facilitates operation and maintenance, makes the operation of blast furnace gas turbine more efficient and healthy, improves the operation rate, and reduces unplanned downtime hours.



6.TRT Flow Passage Optimization Transformation Scope and Compliance Standard

6.1TRT Flow Transformation Following Standards

GBT 28246-2012 "Blast Furnace Gas Energy Recovery Turbine Expander"

GBT 26137-2010 "Thermal Performance Test of Blast Furnace Gas Energy Recovery Turbine Expander"

JB/T4365 "Lubrication, Sealing and Adjusting Oil System"

JB/T9631 "Technical Conditions for Iron Castings of Steam Turbine"

JB/T9637 "Technical Conditions for Turbine Assembly"

GB/T7064 "Technical Requirements for Turbine Type Synchronous Motors"

GB6222 "National Gas Safety Regulations"

YBJ207 "Code for Construction and Acceptance of Metallurgical Machinery and Equipment Installation Engineering" Hydraulic, Pneumatic and Lubricating Systems.

The above-mentioned work shall implement the latest national standards, national technical standards and industry standards.


6.2TRT Flow Transformation and Scope of Supply

According to the user TRT unit model and the actual situation since it was put into operation, the optimization and transformation of flow passage includes the following:

a).Replace all static blades of two stages;

Stator blade design performs multi-round calculation especially for the inlet edge R, which adapts to the wide variation range of inlet angle of attack and ensures high efficiency under various working conditions with wide range before and after the design point.

b).Replace the bearing cylinder;

The cylinder bearing material is QT400-15A, and the center position can be adjusted structurally to make up for manufacturing errors and ensure the coincidence between the center of the shell and the center of the rotor, thus ensuring small and uniform clearance between the blades and the cylinder wall and improving reliability and efficiency.

c).Replace all moving blades of two stages;

The blade has excellent aerodynamic performance, and has the characteristics of no dust accumulation and no blockage.The structure is guaranteed to meet the requirements of strength and vibration.The rotor blade is made of high strength, high temperature resistant stainless steel.The tenon adopts fir-tree type high strength to ensure the fatigue life of the blade.All moving blades are tested for frequency and recorded for reference during maintenance.

d).Replace the rotor (main shaft);

The main shaft adopts high-strength alloy steel 25CrNiMoV integral forging to ensure that the crystal phase structure, physical and mechanical properties of the material fully meet the requirements of TRT operation, and the rotor is subjected to dynamic balance test.

e).Sealing of moving and static blades;

The computer software is used to simulate the working environment, strictly calculate the strain and displacement of the blade in each required state, optimize the tip clearance and root clearance, reduce the loss of air leakage and improve the flow efficiency.

MPG9.2-280.6/180 TRT Unit Flow Optimization Transformation Supply Scope


Serial number

Name

Model/spec.

Quantity/Unit

Remarks

1

First stage stator

Material 17-4PH

1 set


2

First stage rotor

Material 2Cr13

1 set


3

Secondary stator

Material 2Cr13

1 set


4

Second stage rotor

Material 2Cr13

1 set


5

rotor spindle

25CrNiMoV

1 set

Seal with shaft end

6

Bearing cylinder (upper and lower) and accessories
Guide ring

QT400-15A

1 set

Including drive accessories

If you want to learn more, please visit our website used induction heat treating units.

7

BPRT/TRT Intelligent System for Online Energy Efficiency Analysis and Life Management

TELM+
system

1 set

Host computer, display


7.TRT Transformation Workflow and Cycle

Complete all modification work within 6 months from signing the TRT optimization modification contract with the user, and the on-site modification and installation that really affects the operation of TRT shall normally not exceed 10 days.


8.Measures and Benefits of Blade Life Extension

For TRT unit users with high dust content and short blade life, upgrading the blade material (17-4PH) and spraying ceramic coating on the surface can significantly prolong the blade life (more than double the service life), prolong the maintenance cycle interval and reduce the maintenance workload.

17-4PH material (0Cr17Ni4Cu4Nb) is precipitation hardened martensitic stainless steel composed of copper and niobium/columbium, which has high strength, hardness and good corrosion resistance.After heat treatment, the mechanical properties of the product are more perfect, the tensile strength is as high as 890~1030 N/ mm2, the product has good corrosion resistance to acid or salt, and the performance is better than 2Cr13.

Table 3 Comparison of Material Properties of Blades 17-4PH/2Cr13



According to the special working environment of TRT unit blades, the spraying process was improved adaptively, and plasma spraying ceramic technology was applied to the surface anticorrosion of TRT blades.Plasma spraying is a process in which molten material is melted at high temperature by plasma and then the melted material particles are pushed to the surface of parts by means of high-speed gas to form a coating. The thickness of ceramic coating is 0.35 mm. On the basis of ensuring good pneumatic flow efficiency and blade strength, it also has excellent thermal shock resistance and peeling resistance. The surface roughness of the coating is low. The surface roughness of the treated ceramic can reach 0.7μm, which is very smooth. When used in combination with scale inhibitor, the blade life extension effect is obvious.The practice of many TRT users proves that the TRT blades of this process have good wear resistance and corrosion resistance.



After 7 months of operation


The blade material of the unit is upgraded for 7 months (coated)

By adopting the above-mentioned life extension technology, the blade maintenance period is expected to be extended to 1.5-2 times of the original life, thus reducing the maintenance frequency, saving the maintenance cost, and reducing the loss of power saving benefits of shutdown.


9. Quality Assurance and Performance Standard Assurance

Ensure that the optimization and transformation technology of the flow passage of the boiler gas turbine (TRT) is advanced, safe and reliable, and has similar application performance;

Ensure the quality of the supplied parts, carry out necessary inspections and tests on all parts before delivery, and ensure that the whole design and manufacture meet the requirements of relevant regulations;The materials used are all qualified materials, and can provide corresponding material quality certification documents;

After installation and debugging, the supplied parts reach the safety and reliability required by the standard and meet the performance target value of through-flow modification:

After the optimization and transformation of TRT flow, according to the performance evaluation outline agreed by both parties, under the working condition parameters stipulated in the agreement, the TRT power generation power increase is guaranteed to be greater than 892 kW.


10 After-sales service

10.1 Site service of TRT retrofit

Provide users with efficient and high-quality after-sales service, assign qualified and experienced service managers, regularly report the implementation progress of the renovation project, deliver the parts required for the renovation according to the agreement, and arrange professional on-site technical service personnel/teams to be responsible for on-site installation, commissioning and other technical service projects.After the revamped unit is commissioned and evaluated on schedule, it will provide free technical services within the one-year warranty period.


10.2 Long-term TRT maintenance service

A maintenance team composed of turbine engineers and professionals usually provides maintenance services including:

Open the cylinder to clean the rotor;Repair or replacement of moving blades;Repairing the worn parts of the rotor hub;Replace all sealing pieces on the shaft;Journal repair,

The main shaft journal, thrust plate and blade root groove shall be subjected to color flaw detection.

Rust removal, deformation inspection and repair of worn parts of the bearing cylinder;

Fixed blade repair or replacement, replacement of fixed blade bearings and other accessories;

After the rotor is repaired, high-speed dynamic balance is carried out at a speed of 3000 r/min.

Check the clearance between moving and static blades;

Cylinder bearing sealing strip and positioning pin required for field installation;

TRT Service Required by Other Customers


10.3 Long-term supply of spare parts such as blades

It has the capability of blade production and manufacturing, and has a blade spare parts warehouse. Conventional blades can meet the urgent needs of customers.


11.Relevant annexes

List of major processing and manufacturing facilities

Type of device

Model

capacity

Workpiece weight

qty

Place of origin

XxYxZ

kg

set

Horizontal machining center (four-axis)

HM630

1000x800x850

1200

1

Doosan, Korea

Vertical machining center(five-axis)

XHK800

1250 x400 x400

1000

1

China

Vertical machining center(five-axis)

HL5001A

Φ800 x320

1000

1

China

High speed vertical machining center(four-axis)

VF3SS/VF3/VF4

1016 x508 x635

800/1600

6

Haas, USA

Vertical machining center(four-axis)

VM1300A

1300 x650 x710

1500

2

China

Vertical machining center(four-axis)

BV100

1050 x510 x560

700

2

China

Laser cladding system

RC-LCD-800W

Fixed/movable

1500/30000

1

China

Stellite Welding/High Frequency Quenching System

GGC-80-2

1500 x500 x500

500

1

China

Abrasive belt grinding/polishing machine

2M5430

Φ200 x50

50

12

China

Numerical control machine tool group
Laser cladding systemStellite Welding/High Frequency Quenching SystemRotor installation and maintenance deviceAbrasive belt grinding and polishing machine group


Table List of Main Testing Equipment

Device type

Model

measuring range

Quantity

Place of Origin

 

 

XxYxZ

(Taiwan)

 

Coordinate measuring machine

X08107

800x1000x700

1

Wenze, Germany

50x projector

JT36-500

200 x100 x70

1

Xintian Optoelectronics

Tool measuring instrument

E238

Φ280 x380

1

ELBO, Italy

Roughness measuring instrument

SJ-210

 

1

MITU, Japan

Frequency testing system

FSA-C

200-1200

1

Xi'an Jiaotong University

brinell hardness tester

HB-300B

 

1

Beijing era

Nondestructive testing machine

CJW-2000I

0-1500

1

Jiangsu Sanshengda

Spectrum analyzer

WX-5

 

1

Tianjin jinfei


Coordinate measuring machine50x projector

Tool measuring instrument

Roughness measuring instrumentMagnetic particle flaw detectorbrinell hardness tester


11.1List of Customers

Supplier of the main turbine

Shaanxi Blower (Group) Co., Ltd.

Chengdu Engine (Group) Co., Ltd.

Nanjing Turbine Motor (Group) Co., Ltd.

Harbin Steam Turbine Factory Co., Ltd.

Dongfang steam turbine co., ltd

Beijing North Heavy Duty Truck Motor Co., Ltd.

……

End customer

Hebei Iron and Steel Co., Ltd.

Shandong Iron and Steel Group Co., Ltd.

Jiangsu Shagang Group Co., Ltd.

Lianfeng Steel (Zhangjiagang) Co., Ltd.

Changzhou Zhongtian Steel Group Co., Ltd.

Gansu Jiugang Group Company

China Datang Group Corporation

China Resources Electric Power Holding Co., Ltd.

……


11.2 Experience

Dismantling and Repairing of 6# Rotor Bearing Steel of Zhongtian Steel

Repair of No.10 Rotor of Zhongtian Iron and Steel Company by Dismantling and Assembling Bearing Steel

Zhongtian Steel's 7#BPRT Rotor Dismantles and Replaces Blades, Repairs Rotor Bearing Cylinder

Shagang group huasheng ironmaking 2#TRT rotor disassembly and replacement of a full set of dynamic and static blades, rotor bearing cylinder gland laser cladding

Shagang group huasheng ironmaking 7#TRT rotor disassembly and replacement of a full set of dynamic and static blades

Manufacturing, Assembly and Commissioning of Sliding Oil Pump Steam Turbine of CSIC

Tangshan Ruifeng Steel MPG9.7BPRT Rotor Bearing Cylinder Disassembly and Overhaul

Rotor Assembly of Shagang First Coking 18MW Industrial Steam Turbine

Shandong Huantai Thermoelectric 25MW High Temperature and High Pressure Steam Turbine Rotor Disassembly and Assembly Blade

Disassembly and Repair of TRT Rotor in Jinan Steel 3200 Blast Furnace

Disassembling and Assembling Last Stage Rotor of Changqiang Steel Turbine

Jiuquan Steel 3#TRT Rotor Dismantle and Replace Blades

Mapping and Manufacturing of Disassembly and Assembly Blades for TRT Rotor of "MAN Turbine" in Benxi Steel

Optimization of Low Pressure Rotor of Datang Baoding Thermoelectric 8#9#125MW Steam Turbine

Optimization of Jining Jinwei 50MW Combined Cycle Steam Turbine

Optimization of 50MW Combined Cycle Steam Turbine in Beian Thermal Power Plant

Reconstruction of 100MW Steam Turbine in Hulinhe Power Plant

Optimization of 25MW Steam Turbine Rotor Blade in Lianfeng Steel

Optimization of 3#BPRT Rotor Blade in Lianfeng Steel

Optimization of 6#TRT Rotor Blade in Lianfeng Iron and Steel Company

Optimization of 4#BPRT Rotor Blade in Lianfeng Steel

Optimization of 7#TRT Rotor Blade in Lianfeng Iron and Steel Company


11.3 Related photos



Igbt High Frequency Induction Quenching In Water

Enjoy a variety of offers for a wholesale igbt high frequency induction quenching in water, bipolar transistor, JFET transistors, and much more. The transistors function as a gatekeeper for the circuit, letting specific currents flow. They use polarity to impede, enhance, or control the flow of electrons, having a PNP or NPN configuration. These abbreviations refer to the charge of each of their main components: the collector, base, and emitter. Some examples of an NPN transistor include the 2N3904, 2N2222, and BC547, which can all act as amplifiers. As an example of a PNP transistor, the 2N3906 can be cited, also being capable of acting as an amplifier.



There are many different types of transistor classifications. In regards to general use, there’s the function of the transistor as a switch, amplifier, or oscillator. When it comes to the mode of electron transportation, there’s the bipolar junction transistor, or BJT for short, and the field effect transistor, also known as unipolar or FET transistor. The first can use electrons and electron holes for charge-carrying, while the latter only uses one of these methods. Some examples of FET transistors include the HEMT and MOSFET transistor, and they don’t use the PNP NPN configuration of the BJT transistor type. The igbt high frequency induction quenching in water and any other type of transistor has a tolerable value for current and voltage. Make sure to consult the sheet of values for the specific transistor in your project.



On Alibaba.com, you can get in contact with international suppliers. Find wholesale igbt high frequency induction quenching in water and other types of transistors, such as the 2sc5200, 2n6292, and 2n7000. Choose the right transistor for your circuit and project.

If you are looking for more details, kindly visit china plane cutter high frequency quenching factory.